• Labs from FALL 1997
    1. Introduction to the hardware and software.
    2. Reaction time tester.
    3. One-octave keyboard.
    4. Serially controlled, 8-channel DVM.
    5. Capacitance measurement.
    6. Digital/analog mixer/delayline.
    7. Motor position controller.
    8. Design project.

  • Labs from SPRING 1999
    1. Introduction to the hardware and software.
    2. Reaction time tester.
    3. One Octave Synthesizer.
    4. Serially controlled, digital capacitance meter (DCM).
    5. Add a keyboard and display to the DCM.
    6. Choice:
    • Digital Voltmeter
    • Calculator
    7. Design project
     

  • Labs from SPRING 2000
    1. Introduction to the hardware and software. (week of Jan 31)
    2. Reaction time tester. (week of Feb 7)
    3. Cricket call generator (weeks of Feb 14 and Feb 21)
    4. Serially controlled, sinewave generator. (weeks of Feb 28 and Mar 6)
    5. Add a keyboard and display to lab 4. (weeks of Mar 13 and Mar 27)
    6. Digital Voltmeter (weeks of April 3 and April 10)
    7. Design project (weeks of April 17, 24 and May 1).

  • Labs from SPRING 2001
    1. Introduction to the hardware and software. (week of Jan 28)
    2. Reaction time tester in ASM. (week of Feb 4)
    3. Cricket call generator in C (weeks of Feb 11 and Feb 18)
    4. Security system in C. (week of Feb 25)
    5. Sinewave generator with keypad and LCD display in C and ASM. (weeks of Mar 4and Mar 11)
    6. Digital thermometer and fan (weeks of March 25 and April 1)
    7. Design project (weeks of April 8, 15, 22 and 29).

  • Labs from SPRING 2002
    1. Introduction to the hardware and software. (week of Jan 27)
    2. Reaction time tester. (week of Feb 3)
    3. Cricket call generator. (week of Feb 11)
    4. Security system. (weeks of Feb 18 and Feb 25)
    5. Sinewave generator with keypad and LCD display in C and ASM. (weeks of Mar 4and Mar 11)
    6. Digital thermometer and fan (weeks of March 25 and April 1)
    7. Design project (weeks of April 8, 15, 22 and 29).

  • Labs from SPRING 2003
    1. Introduction to the hardware and software. (week of Feb 3)
    2. Reaction time tester. (week of Feb 10)
    3. Television control and video clock. (week of Feb 17)
    4. Serial control of TV graphics. (weeks of Feb 24 and Feb Mar 3)
    5. Oscilloscope etch-a-sketch (weeks of Mar 10 and Mar 24)
    6. Digital thermometer and fan (deleted?)
    7. Design project (weeks of March 31, April 7, 14, 21 and 28).

  • Labs from SPRING 2004
    1. Reaction time tester. (week of Feb 9)
    2. Sinewave synthesis(week of Feb 16)
    3. Security system(week of Feb 23 and Mar 1)
    4. TV oscilloscope. (weeks of Mar 8 and Mar 15)
    5. Digital thermometer and fan (Mar 29)
    6. Design project (weeks of April 5, 12, 19 and 26 and May 3).

  • Labs from SPRING 2005
    1. Reaction time tester. (week of Feb 7)
    2. Cricket call synthesizer (week of Feb 14 and 21)
    3. Security system (week of Feb 28)
    4. Video game with analog control (weeks of Mar 7 and Mar 14)
    5. Digital thermometer and fan (week of Mar 28)
    6. Design project (weeks of April 4, 11, 18 and 25 and May 2).

  • Labs from SPRING 2006
    0.Introduction to the hardware and software (week of Jan 30)
    1.Stop Watch (week of Feb 6)
    2. DTMF dialer with voice feedback (weeks of Feb 13,20)
    3. Security system (week of Feb 27)
    4. Video game with analog control (weeks of Mar 6,13)
    5. Digital thermometer and fan (week of Mar27)
    6. Design project (weeks of April 3,10,17,24 and May 1).

  • Labs from SPRING 2007
    0. Introduction to the hardware and software (week of Jan 29)
    1. Reaction time measurement (week of Feb 5)
    2. Cricket call synthesizer (weeks of Feb 12,19)
    3. Security system (week of Feb 26)
    4. Digital oscilloscope (weeks of Mar 5,12)
    5. Talking digital thermometer and fan controller (week of Mar 26)
    6. Design project (weeks of April 2, 9, 16, 23, 30).